Obligatoires3 ECTSSemestre 445 h d’enseignementLangue d’enseignement : croate

Description du cours

La description du cours est disponible uniquement en croate.

  • Tehnika i tehnologija građenja (građevinski radovi, tehnika i tehnologija građenja građevinska mehanizacija obilježja suvremene građevinske mehanizacije)
  • Transportna sredstva pri građenju (transport pri građenju, utovarivači i vozila toranjske i samohodne dizalice, gradilišna dizala i podizači)
  • Strojevi i tehnološka oprema za zemljane i geotehničke radove u tlu i stijeni: (zemljani radovi, površinski iskop u tlu i stijeni, dozeri, skrejperi, strojevi za struganje stijene, bageri, uređaji i alati bagera, rovokopači)
  • Strojevi i oprema za miniranje stijene, pokretne drobilane, strojevi za ugradba sipkih gradiva
  • Izbor strojeva za površinske zemljane radove, strojevi i oprema za geotehničke i podzemne radove, strojevi i oprema za rušenje građevina
  • Strojevi i tehnološka oprema za betonske i asfalterske radove: (betonski radovi, transportirani betoni, oprema proizvodnja svježeg betona, tvornice betona, oprema za transport i ugradnju svježeg betona)
  • Oprema za izvedbu plošnih betona i žbuka, izbor strojeva za betonske radove
  • Asfalterski radovi, oprema za izvedbu asfaltbetona, oprema za izvedbu asfaltnih makadama, oprema za obnovu asfaltnih kolnika
  • Učinak standardnih građevinskih strojeva i transportnih sredstava
  • Izbor i planiranje strojnog rada pri građenju

Quand et où

The timetable and room occupancy are available after signing in with your TVZ account.

Sign in with TVZ account

Acquis d’apprentissage

Les acquis d’apprentissage sont affichés en anglais.

  1. make distinction between standard construction machines and other required construction machinery and equipment
  2. analyse the technique, technology, logistics and organisation of technological processes used in earth, concrete and asphalt works
  3. specify types of construction machines, transport devices and other technological equipment for realization of works
  4. form groups of construction machines and transport vehicles for the realization of construction works
  5. establish flow diagrams and technology-based maps for utilisation of construction machinery in construction works
  6. calculate performance of standard construction machines and transport devices (performance of vehicles and cranes)
  7. anticipate types of logistic, technical and technological resources that are needed for realization of construction works
  8. develop possible alternatives for organizing technological and logistical processes relating to earthworks, concrete works and asphalt works
  9. combine possible alternatives for organizing technological and logistical processes relating to selection of construction machinery
  10. define an optimum construction machinery with regard to organisation of technological and logistical processes during construction work

Bibliographie

Bibliographie obligatoire

  • Z. Linarić : ?Leksikon strojeva i opreme za proizvodnju građevinskih materijala, Učinci građevinskih strojeva i vozila pri zemljanim radovima?, biblioteka Mineral, Business Media Croatia d.o.o., Zagreb, 2007.
    P.Đukan i suradnici: Strojevi u građevinarstvu, Građevinar, Zagreb, 1991
    E.Slunjski: Strojevi u građevinarstvu, Sveučilište u Zagrebu, 1995.

Bibliographie complémentaire

  • Z. Linarić : ?Postrojenja za proizvodnju sipkih i povezanih mineralnih gradiva, drobilane, tvornice betona, asfaltne baze?, biblioteka Mineral, Business Media Croatia d.o.o., Zagreb, 2009
    R. Lončarić: ?Organizacija graditeljskih projekata? , Sveučilište u Zagrebu, Zagreb, 1995,
    Freddy L. Roberts i dr.: ?Vruće asfaltne mješavine?, HSGI, 2003.

Responsables du cours 2

Intervenants 2

Dates d’examen

dans 10 jours max. dans 30 jours max. plus tard ont eu lieu
Source : ISVU. Un clic sur une session ouvre Studomat pour l'inscription à l'examen ; vérifie-y aussi d'éventuelles modifications.