Saltar al contenido
Mi perfil

Asignatura

Gestión de la producción y de proyectos

Optativas4 ECTS5.º semestre45 h docenciaIdioma de enseñanza: croata

Descripción de la asignatura

La descripción de la asignatura solo está disponible en croata.

  • Uvodne napomene o načinu slušanja predmeta i sva pravila studiranja i polaganja
  • Definiranje i obrada svih teorijskih ciklusa proizvodnje
  • Definiranje i obrada svih ciklusa proizvodnje i međuoperacijskih zastoja
  • Stvarni ciklus proizvodnje i koeficijenti protoka kao i njihova ovisnost
  • Prikazivanje aktivnosti sastavljanja proizvoda po shemi sastavljanja gantogramom unatrag
  • Optimalni redoslijed lansiranja radnih naloga
  • Gospodarenje repromaterijalima i proračun ekonomskih količina, serija i zaliha
  • Određivanje vrsta zaliha na temelju različitih kriterija
  • Rezerviranje i planska raspodjela repromaterijala
  • Uvodne napomene i razlozi uvođenja tehnika mrežnog planiranja, a posebno tehnike PERT i CPM koje se prikazuju u dijagramu strelica
  • Primjena tehnika mrežnog planiranja
  • Prikaz tehnika mrežnog planiranja u vremenskoj skali (gantogram)
  • Optimizacija tehnika mrežnog planiranja odnosno projekata
  • Pravila korištenja PD u upravljanju projektima i blok kartična tehnika
  • Prikaz jednog od SW za planiranje projekata korištenjem tehnika mrežnog planiranja

Cuándo y dónde

The timetable and room occupancy are available after signing in with your TVZ account.

Sign in with TVZ account

Course announcements

  • 4.11. - otkazana nastava

    Read on Digit ↗
  • Ispit/kolokvij, ponedjeljak, 21.9., 17:30h, Vrbik 8, 1. kat, ALL PC lab

    Read on Digit ↗
  • Ispit/kolokvij, srijeda, 9.9., 16:30h, Vrbik 8, 1. kat, Audit-lab

    Read on Digit ↗
  • Ispit/kolokvij, srijeda, 15.7., 16:30h, Konavoska-1206

    Read on Digit ↗
  • Ispit/kolokvij, petak, 10.7., 17:00h, Konavoska-1115

    Read on Digit ↗

Source: Digit (Moodle). Full announcements are available to students enrolled in the e-course.

Resultados de aprendizaje

Los resultados de aprendizaje se muestran en inglés.

  1. ability to plan mass production and individual projects (time and materials)
  2. ability to manage serial production and individual projects (time and materials)
  3. allocate production cycles in relation to the type of production (single, serial and mass)
  4. identify delays between operation
  5. calculate the odds of flow and actual production cycles
  6. Draw Gantt ie display the planning tasks in the time diagram and chart ahead and diagram back
  7. calculate the optimal order of launch work orders
  8. calculate all the key elements of good management material, and there are economic quantities, inventory, provision and planned disposition of materials
  9. ability to identify the tools to be used to manage time and materials
  10. ability to create a flow chart of a project
  11. ability to draw a schedule diagram or a technique of network planning

Bibliografía

Bibliografía obligatoria

  • I:Čala: Inženjerski priručnik, poglavlje 6. Planiranje i praćenje proizvodnje, Školska Knjiga, Zagreb, 2002.
    A.Vila i suradnici: Modeli planiranja proizvodnje u industriji, Informator, Zagreb, 1983.
    G. Nikolić, I. Čala, V. Alić Kostešić: Metode planiranja u proizvodnji odjeće, Sveučilišni udžbenik, Zagreb, 2010

Bibliografía complementaria

  • M. Omazić i S. Baljkas: Projektni menadžment, Sinergija Zagreb, 2005
    A. Hauc: Projektni Management, Založba Ljubljana 2007

Responsables de la asignatura 1

Docentes que imparten la asignatura 1

Exámenes

Las convocatorias de este curso académico aún no se han publicado. El curso pasado se celebraron:

en 10 días en 30 días más tarde celebradas
Fuente: ISVU. Al hacer clic en una convocatoria se abre Studomat para inscribirte en el examen; comprueba allí también posibles cambios.