The design of the water pump station

stručni rad

stručni rad

The design of the water pump station

Vrsta prilog sa skupa (u zborniku)
Tip stručni rad
Godina 2023
Nadređena publikacija Proceedings of the 16th International Scientific Conference INDIS 2023
Stranice str. 584-589
ISSN 1332-8166
EISSN 0000-0000
Status objavljeno

Sažetak

The plan is to construct a water pump station for the drinking water treatment facility. The location of the water pump station is near river Drava in Croatia. The goal of the paper is to present the design process of the water pump station. The well-lowering approach is applied. The pump station is reinforced concrete construction. Excavation of the soil from inside the walls will reduce the bearing strength of the soil and allow the walls to penetrate the soil under self-weight. The casting of the walls is in phases. The paper will present the process of wall penetration in soil, the stability of the well, and the main reinforcement design.

Ključne riječi

water pump station, design, well-lowering approach